Material Loading/Unloading, Shifting and Handling on actual quantity
basis of MM Dept., at Bokajan Unit
29-06-2024
05-07-2024
05-07-2024
06-07-2024
Procurement of Simples Roller Chain and Connecting Link.
07-06-2024
24-06-2024
24-06-2024
25-06-2024
PROCUREMENT OF ANCHOR.
05-06-2024
12-06-2024
12-06-2024
13-06-2024
“Replacement of C.G.I. Sheets at various Plant
Structures(roof/side cladding) inside Bokajan Cement Factory at different level/height. The
Contractor should be experienced manpower resources etc to take up the above work with safety
06-06-2024
19-06-2024 upto 1430 hrs
19-06-2024 upto 1500 hrs
20-06-2024 at 1505
Procurement of Bottom Brum Assly and Top Drum Assly
06-06-2024
21-06-2024
21-06-2024
22-06-2024
PROCUREMENT OF V-BELTS.
06-06-2024
21-06-2024
21-06-2024
21-06-2024
Procurement of Humidity & Temperature Control Cabinet for CCI-Bokajan through GeM
05-06-2024
20-06-2024
20-06-2024 ; 3:00pm
20-06-2024 ; 3:30pm
Procurement of CGI Sheets for CCI-Bokajan through GeM
04-06-2024
19-06-2024
19-06-2024 ; 3:00pm
19-06-2024 ; 3:30pm
Procurement of Brick Cutting Blade.
03-06-2024
14-06-2024
14-06-2024
14-06-2024
Procurement of Spares for F.K. Pump at Bokajan Unit